Wednesday, February 29, 2012

Reflection#6

Today the people who had their PowerPoint presented. Those who didn't have theirs just turned in their report. We started on something else that will be done while nyguen is gone.

Friday, February 24, 2012

Reflection #5

Today we showed Nyguen our dimensions and we started in the chair,  even though it's due Monday.  We will work over it over the weekend.
2/23/12

Reflection #4

Today it was just me and Mike.  We had to correct the dimensions. We had inches instead of feet and even with the inches it was 8 and 9 inches,  not even a foot.
2/21/12

Monday, February 13, 2012

Reflection #3

Today we finished our package except that Micheal has all of our sketchs and we need them to make the package complete. We are making our prototype and we have changed the chair we are doing. The chair we have choosen is different than what everyone else is doing and it has all the qualities that Mrs.Nyguen said it has to be.

Thursday, February 9, 2012

Reflection #2

Today we worked in a group to finish our report for the cardboard chair. We did all the way up to number 6. The matrix we had to do last but we didnt have enough time to finish. The final sketch is the one we are going to build and we have to have an isometric sketch, side front, and top.

Reflection #1

Today, we choose which 6 chairs we wanted out of the 21 sketches. we made a model out of index cards to show how the chair would look. We out weights on the chaair to see if it will hold. If it couldnt we had to mad a different design that would have a back, three or more legs and is at least 2 inches off of the floor.

Tuesday, February 7, 2012

Job Assignments

SHAMBREE
  • Cover Page
  • Table of Contents
  • Introduction
  • Problem Statement
  • Research and Investigation

SOPHIA

  • Possible Design Solutions
  • Selected Design Solution
  • Development Work and Analysis
  • Prototype Construction

MIKE

  • Testing and Evaluation
  • Conclusion
  • Powerpoint Presentation Requirement
  • Reference